AESI
- BIOMASS TO ENERGY FUEL HANDLING-2010
- CONVEYORING & FUEL BINS IN THREE LOCATIONS, BOISE, ID, KENTUCKY & NORTH CAROLINA
ANTHONY TIMBERLANDS
- HARDWOOD LAMINATED LUMBER PLANT
- SHERIDAN, AR-2005 DESIGN-BUILD
BANKS LUMBER COMPANY
- TWIN BANDMILL-2013
- OPTIMIZED GANG EDGER 2013
COLLINS PINE LAKEVIEW
- HEADRIG ROLLCASE WITH CANT CATCHERS
- HORIZONTAL SHIFTER CONVERSION
- TMT OPTIMIZING COMBO EDGER INSTALLATION
- SMALL LOG MILL PROJECT-2007
- 12" DA GANG INSTALL-2004
- MILL EXIT LINE IMPROVEMENTS-2003
- DEBARKING LINE/DESIGN, PROCURE CONTRUCT 2007
- SMALL LOG MILL UPGRADE m TO SIDE BOARD CAPABILITY-2013
COLUMBIA FIBRE
- CHIPPER PRESS ROLL-2205
- CHIPPER INFEED IMPROVEMENTS-2006
- URBAN WASTE PROJECT-2006
- CONVEYOR REBUILD-2006
- DESIGN LAYOUT CHIP PLANT-2008
- CHIP PLANT DISMANTLE-2008
- CHIPPER HOOD REPLACEMENT-2008
COLUMBIA VISTA CORPORATION
- HEADRIG LOADING- DESIGN- BUILD-1998
- DEBARKING LINE- DESIGN – BUILD-1992
- NEW CARRIAGE & TRACKS INSTALLATION-2008
- BANDMILL INSTALLATION-2009
- STACKER LINE INSTALLATION-2008
COLVILLE POWER AND VENEER
- COMPLETE DEBARKER & BUCKING LINE-2007
- BOILER FEED SYSTEM WITH A TRIPPER CONVEYOR & FOUR WALKING FLOORS-2007
DOUGLAS COUNTY FOREST PRODUCTS
- PRIMARY LINE UPGRADE-2005
- EDGER ADDITION-2007
- FUEL HANDLING UPGRADES FOR COGEN ADDITION-2008
ENGINEERED MATERIALS OF MAINE
- LAMINATED BEAM PRODUCTION LINE (NEW PRODUCT) 2001
- SORTING AND SIZING LINE FOR ABOVE-2001
FLORAGON FOREST PRODUCTS/INTERFOR PACIFIC
- 10" GANG EDGER ADDITION MILL 5-1999
- LOG HANDLING IMPROVEMENTS-STUD MILL-2000
- PLANER IMPROVEMENTS-2002
- PACKAGING- DESIGN- BUILD-INTERFOR-2008
- OPTIMIZED LOG BUCKING-DESIGN-BUILD-2002
- SORTER INSTALLATION AND DESIGN-2001
- CURVE SAWING GANG INSTALLATION AND ENGINEERING-2001
GRAM LUMBER
- PLANER MILL, HEADRIG REPLACEMENT-1995
- 2" EDGER ADDITION-1996
- LOG YARD RECLAIM SYSTEM-1988
HAMPTON LUMBER MILLS
- MORTON SAWMILL-FLAIR EDGER, FABRICATION AND INSTALLATION-2002
- MORTON SHARP CHAIN-DESIGN-BUILD-2000
- A-5 DEBARKER REBUILD AND INSTALLATION-WILLAMINA 2007
- PLANER PACKAGING LINE-WILLAMINA 2007
- TILT HOIST AND RE-ENTRY FOR THE NEW PLANING MILL-WILLAMINA 2008
- LUG FEEDER AND UNSCRAMBLER AT TILLAMOOK-2007
- DEBARKER WASTE SYSEM REMODEL-WILLAMINA 2006
- FINGER JONT FEED SYSTEM BLOCK BINS-WILLAMINA 2006
- MORTON 35" DEBARKER-2005
- RANDLE SCC STACKER LINE-2005
- PLANER PACKAGING LINE #2-WILLAMINA
- TILLAMOOK-BOILER FUEL HANDLING 2006
- WARRENTON-DESIGN, FAB AND INSTALL LOG MERCHANDIZER LINE-FOUR LINEAL POSITIONED SAW MODULES WITH EASY DOWN LOG CRADLES WITH ENCODED VFD
DRIVES THROUGH OUT, 2011
- WARRENTON-DESIGN, FAB AND INSTALL THREE ARM, 42' LONG, ENCLOSED ROTARY LOG KICKER WITH ROTARY ARMS IN TWO 20' SECTIONS WITH ENCODED VFD DRIVES-2011
- WARRENTON-INSTALLATION OF USNR-DLI PRIMARY LOG BREAKDOWN LINE/INFEED & OUTFEED/RECONDITIONED LOG DECKS & STEP FEEDER/ALL SUPPORT STEEL, CATWALKS AND DECKING-2011
HUMBOLDT REDWOOD COMPANY, LLC-SCOTIA, CA.
- EPC A TWIN BANDMILL SYSTEM FOR RECOVERY-2012
- EPC A GRADE SAWING SIDE TO THE MILL INCLUDING A PONY CARRIAGE, QUAD BANDMILL, TIMBER TRIM LINE, COMPLETE RESIDUAL SYSTEM REMODEL-2013
INTERFOR PACIFIC
- PACKAGING LINE-2006
INTERMOUNTAIN RESOURCES, LLC
- ALL JOBS ON A DESIGN/BUILD BASIS
- HORIZONTAL SHIFTERS, 2" EDGER SHARP CHAIN ADDITION
- SMALL DEBARKER LINE-1998
- REMAN EDGER ADDITION-2000
- STUD STACKER ADDITION-2000
- HEADRIG ROLLCASE AND JUMP CHAINS-1997
- LUNDEEN STACKER ADDITION-1999
- OPIMIZED EDGER INSTALL-2001
- REPLACE ENTIRE HEADRIG AREA 2002-03
- FINGER JOINTER AND OPTIMIZED CUT-UP LINE-2009
- BOILER PLANT RELOCATION 2009 & 2010
KING FOREST PRODUCTS
- A-7 NICHOLSON-1998
- CHIP PLANT-DESIGN AND CONSTRUCT-1998
KINZUA RESOURCES LLC/BOISE CASCADE-PILOTROCK
- MCGEEHEE SL ADDITION FIELD SERVICES & FABRICATION-2000
- 12" USNR DOUBLE ARBOR GANG-ENGINEER AND BUILD-2002
- HORIZONTAL CAPACITY MODIFICATIONS-2002
- HORIZONTAL OUTFEED MODIFICATIONS FOR 12" CANTS-2003
- SORTER DIVERTER CONVERSION-2003
- TRIMMER OUTFEED
- BOILER STARTUP WITH FUEL HANDLING 120,000 LB/HR
LONGVIEW FIBER-CLATSKANIE
- REPLACE THE 9 X 40 DRUM AND REBUILD SUPP0RT FRAMES
- 12 X 20 BM&M SCREEN INSTALLATION
MAINE WOODS CO.
- TURN KEY HARDWOOD SAWMILL-1998
- INCLUDING SAWMILL, SORTER, BOILER & KILNS/WITH FUEL HANDLING
- 40,000 LB. BOILER
MARY'S RIVER LUMBER CO.
- PLANER MILL INSTALLATION AND MISCELLANEOUS SAWMILL ADDITIONS-MONTESANO 1999
- S-TURN UNSCRAMBLER, HORIZONTAL FEED REVISIONS, QUAD BANDMILL INSTALLATION-MONTESANO 1998
- SHARP CHAIN FABRICATION AND INSTALLATION-MONTESANO 1998
- LUMBER SORTER/TRIMMER-MONTESANO
- OPTIMIZER PROJECT-ENGINEERINGAND INSTALL-2003
- BEVEL SIDING PLANT ADDITION-2006
- PLANT REMODEL/PHILOMATH RESAW/TRIM LINE-2002
- OPTIMIZING EDGER/PHILOMATH-2005
- TRIMMER INFEED REMODEL
- HEADRIG SLABBER INSTALLATION & ENGINEERING
- COMPLETE DEBARKING LINE, BUCKING & HOG SYSTEM AT MONTESANO, WA-2009
- MONTESANO-DESIGN, FAB AND INSTALL LOG FLARE BUTT REDUCER-2011
- MONTESANO-DESIGN, FAB AND INSTALL ROTARY SCREW LOG FEEDER FOR SINGULATING AND EVEN ENDING OF LOGS-2011
- ENGINEERING FOR NEW MILL-2013 (IN PROGRESS)
- BOW HILL LUMBER UPGRADE-2013 (IN PROGRESS)
- SCRAGG FOR PHILOMATH-2013
OLYMPIC FOREST PRODUCTS
- HEADRIG OUTFEED ROLLCASE & TRANSFERS
- HITECH SORTER, HORIZONTAL TWIN-INSTALL & FAB.
- DESIGN & INSTALL 3 EDGER SYSTEMS
- NEW HEADRIG & CARRIAGE-WASTE SYSTEMS-2000
- TWO WCIS EDGER OPTIMIZERS/COMPLETE -2002
- REMODEL WITH 5 MAJOR MACHINERY CENTERS-2003
- TIMBER HANDLING AND SAW-2014
- PURLIN EDGER ADDITION-2014
REDWOOD EMPIRE
- ADDITION OF A RECONDITIONED OPTIMIZED TRIM LINE, RE-EDGER, MATERIAL HANDLING, STARTUP
RECOVERY 1, INC.
- COMPLETE RECYCLING SYSTEM FOR WASTE WOOD TO PAPER CHIPS
- 1000HP HOG & 300HP/ 2-10 X 20 BM&M SCREENS
ROSEBURG FOREST PRODUCTS-2008
- SUPER DRYER SUPPORT STRUCTURES & TOWERS
- TOTALLY ENCLOSED FEED STOCK CONVEYORING TO SUPER DRYER
RSG FOREST PRODUCTS-24 years of Design, Manufacturing and Construction (Various Plant Sites)
- TRIMMER OPTIMIZER ADDITION, HORIZONTAL
- RESAW INFEED SYSTEM-2 PLACES
- PLANER SORTER LINE KALAMA- 2000
- TWIN HORIZONTAL, 2" EDGER, HORIZONTAL-2000
- NEW CHIPPER SYSTEM
- OPTIMIZED TRIMMER, OPTIMIZED EDGER,
- GANG, TIMBER SYSTEM MATERIAL HANDLING
- HEADRIG ROLLCASE, DEBARKER INFEED,
- CHIP SYSTEM, HITECH SORTER SYSTEM
- TRIMMER OPTIMIZER, COASTAL PLANER,
- GANG EDGERS (4 PLACES) AND BOARD EDGER (5 PLACES)
- 2002:
- HORIZONTAL TWIN AND GANG ADDITION KALAMA
- STICKER STACKING SYSTEM, WET LUMBER DROPOUT
- EIGHT WCIS MANUFACTURED EDGER OPTIMIZERS
- COMPLETE MILL REBUILD WITH SIX NEW MACHINERY CENTERS-MOLALLA-2005 COMPLETION
- PRECISION MILL DEBARKER REBUILD 2006
- DEBARKER INFEED CONVEYOR 2006
- NEW PLANER MILL MOLALLA-2006
- BANDER DUNNAGE UPGRADE-2013
ROUGH AND READY LUMBER-2014
- TIMBER DOCK
- REFURBISH AND INSTALL 12" OPTIMIZING GANG
- SAWMILL TRIMMER LINE
- SAWMILL SORTER SYSTEM
- PLANER SORTER/STACKER LINE
- PLANER INFEED SYSTEM
- PLANER SYSTEM
- TWIN RESAW
SARATOGA FOREST MANAGEMENT
- REBUILD AND STARTUP OF THE SAWMILL INCLUDING FLARE BUCKING LINE, OPTIMIZED EDGER, RESIDUAL SYSTEMS AND TRIMMING, STACKING LINES-2012, 2013
SCANWARE - SCAN FRAMES-12 SYSTEMS
SPANISH TRAIL LUMBER-MARIANNA, FL.
- TMT EDGER INSTALL-2009
- COMACT CURVE SAW GANG INSTALL-2009
- MULT-Saw LOG MERCHANDIZER-2010
- NELSON BROTHERS TRIMMER SCANNER UPGRADE-2010
- TMT REMAN EDGER-EPC CONTRACTOR-2012
- DEBARKER INSTALL-2013
- RESIDUAL UPGRADE-2013
STIMSON
- TILLAMOOK PLANER FABRICATION
- GANG EDGER INFEED
- NEW DEBARKER INSTALLATION-2006
- FENCING ADDITION-PLUMMER-2011
- DESIGN, BUILD AND INSTALL ALL SUPPORT EQUIPMENT FOR USNR PRIMARY LINE
REBUILD-TILLAMOOK-2011 - UPGRADE CANTER TO CANTER TWIN-2013 (JOB IN PROGRESS)
SWANSON GROUP
ROSEBURG
- USNR EDGER OPTIMIZER PLANNING AND INSTALLATION
- INSTALLATION OF NEW PLANNING MILL-2005
- FABRICATION OF MATERIAL HANDLING FOR PLANER MILL-2005
- DEBARKER INSTALL-2013
NOTI
- VERTICAL TWIN SYSTEM AND OPTIMIZED EDGER UPGRADE-2007
- SORTER ADDITION-2004
SUPERIOR LUMBER-GLENDALE
- REVISIONS TO UPGRADE USNR PLANER
- LOG BUCKING SYSTEM REMODELS
- END DOGGER UPGRADES-2011
- QUADRANT LOG FEEDER REBUILD AND INSTALL-2013
- DRY KILNS-2013
- PLANER INFEED UPGRADE-2013
- GRADE SORTER UPGRADE
SPRINGFIELD PLYWOOD VENEER
- DEBARKER & BUCKING UPGRADES-2007
- DRYER REBUILD PROJECT-2008
- LATHE LINE UPGRADES-2008
- LAYUP LINE INSTALLATION-2009
- LAYUP LINE FABRICATION OF SUPPORT STEEL, PACKAGE TRANSFERS & ROLLCASES
TEEVIN BROS. LAND AND TIMBER COMPANY
- RAINIER DEBARKER PROJECT-2013
TOLER & SON LUMBER COMPANY
- HORIZONTAL RESAW ADDITION
- LOG DECK AND LOADING SECTION FOR CARRIAGE
- MILL FLOW CHANGES
- WASTE SYSTEM REMODELS
- BOILER FUEL BIN-2006
- COMPLETE HOG FUEL SYSTEM-2006
TRINITY RIVER LUMBER
- HORIZONTAL TWIN, 4" GANG, WCIS OPTIMIZING EDGER/RESIDUAL SYSTEMS ETC.-2008
- COMPLETE 40,000 SQ. FT. SAWMILL FROM GROUND UP – DESIGN, PROJECT MANAGEMENT, SUPPLY AND INSTALLATION SERVICES
- TWO PLANER LINE, TWO TRIMMER LINES, ONE SORTER LINE
- REFURBISH EXISTING LOG HANDLING EQUIPMENT AND DEBARKER
- SUPPLY AND INSTALL DUAL SHIFTING 84" CHOP SAWS
- INSTALL 6' TILTED HEADRIG, SLANT 48" CARRIAGE
- INSTALL 6' TWIN HORIZONTAL RESAW
- INSTALL 5' HORIZONTAL RESAW
- INSTALL THREE EDGER SYSTEMS, COMPLETE WITH WCIS SUPPLIED OPTIMIZED C-FRAME CLAMP AND SCAN INFEED CHARGERS
- REFURBISH AND INSTALL 4X4 TRIM LINE
- REFURBISH AND INSTALL 48 BIN SORTER
- REFURBISH AND INSTALL YATES A100 PLANER
- REFURBISH AND INSTALL YATES A95 PLANER
- REFURBISH AND INSTALL COMPLETE 2X4 TRIM LINE, NOMINAL TRIMMER AND P.E.T. TRIMMER
- SUPPLY AND INSTALL COMPLETE MILL RESIDUAL SYSTEM
- FABRICATE AND REFURBISH NEARLY ALL MATERIAL HANDLING BETWEEN MACHINE CENTERS.
- 4 X 4 PET TRIMMER-2013
- 2 X 4 TRIM SAWS-2013
- SORTER BINS-2013
- INSTALL TRIM SAWS-2013
TMI
- BUIILDING ADDITION, OPTIMIZED BOARD EDGER, RESAW, LANDING TABLE, SORT STATION, COMPUTER ROOM-2003
- DOG EAR LINE-DESIGN-BUILD-2005
- MAXIMILL ADDITION-2006
- OPTMIZED GANG EDGER INSTALL-2013
UNIVERSAL FOREST PRODUCTS (Various Plant Sites)
- RIP SAW INFEED TABLES
- LUG FEEDERS
- MOULDER FEED TABLES
- MATERIAL HANDLING
- EQUIPMENT FOR RIPSAWS, PLANER
UPPER COLUMBIA
- DEBARKER LINE INSTALLATION-2008
- 6-SAW LOG MERCHANDIZER-2013
- NEW DEBARKER LINE-2013
- EPC CONTRACTOR ON BOTH SYSTEMS-2013
USNR
- TURNKEY RESAW, HEADRIG OUTFEED INSTALLATION, FAB, SUPPORT ITEMS & DESIGN-TOLER LUMBER
- CENTRALIA MATERIAL HANDLING
- SUN STUDS PACKAGING
- SUPPORT ROLE IN USNR MATERIAL HANDLING AND INSTALLATION MISC. PROJECTS
- CHUGOKU MERCHANDISER FABRICATION & MILL FLOOR MATERIAL HANDLING
- WEYERHAEUSER SANTIAM LOG HANDLING EQUIPMENT
- WEYERHAEUSER SANTIAM LUMBER HANDLING EQUIPMENT
- BENNETT SORTER LINE
- LOG HANDLING EQUIPMENT FOR RUSSIA-2012
W.K.O. /HIGH CASCADE
- NEW PLANER MILL CONSTRUCTION-WKO 2000
- TRIMMER UNSCRAMBLER-WKO 1996
- VENEER DIVERTERS-HIGH CASCADE 1992
- 3- STAGE SHIFTING TRIMMER FENCE-WKO 2000
- 12" DAC UKIAH-WKO
- OPTIMIZER CONVERSION ON A BOARD EDGER-WKO
- SMALL LOG ADDITION-WKO
- GANG OPTIMIZER INSTALLATION-WKO
- HANEL MILL REBUILD WKO 2004/2005
- DOUBLE LENGTH DESIGN/FAB/INSTALL-WKO 2008
WEYERHAEUSER
- TRUS JOIST- BUNDLE NESTING AND PAKAGING LINE-2005
- LEBANON LUMBER- A-5 DEBARKER, INFEED,
- QUAD FEEDER AND OUTFEED-DESIGN AND INSTALL
- BAUMANS-PLANER PACKAGING LINE FOR DUNNAGE PLACEMENT
- DALLAS-TWIN HORIZONTAL RESAW INSTALL
- SANTIAM RESIDUAL CONVEYOR SYSTEMS
- DALLAS HOG FUEL HANDLING TO REPLACE HIGH PRESSURE BLOWER SYSTEM
- COASTAL PLANER ADDITION-BAUMAN
- HEADRIG LOG LOADING-BAUMAN
WILLIS ENTERPRISES
- 600' OF 42" CONVEYORING FOR CHIP HANDLING TO TRUCK OR TRAIN CARS AT CLE ELUM, WA-2007
- CHIP PLANT AT HOQUIAM-2008-2009
117" NICHOLSON CHIPPER
9 X 60 PSI DRUM DEBARKER
LETOURNO LOG CRANE
HOG FUEL & CHIP HANLDING - CHIPPER INSTALLATION AT BELFAIR-2008
96" CHIPPER & CHIP CONVEYORS
RAISE THE DRUM DEBARKER LINE BY 6'
W.K.O./HIGH CASCADE
- NEW PLANER MILL CONSTRUCTION-WKO 2000
- TRIMMER UNSCRAMBLER-WKO 1996
- VENEER DIVERTERS-HIGH CASCADE 1992
- 3- STAGE SHIFTING TRIMMER FENCE-WKO 2000
- 12" DAC UKIAH-WKO
- OPTIMIZER CONVERSION ON A BOARD EDGER-WKO
- SMALL LOG ADDITION-WKO
- GANG OPTIMIZER INSTALLATION-WKO
- HANEL MILL REBUILD WKO 2004/2005
- DOUBLE LENGTH DESIGN/FAB/INSTALL-WKO 2008
- BOILER RELOCATION WITH A CLARKES FUEL BIN FROM SAGINAW, OR TO CARSON, WA-1992